We are pleased to send through our March update on the construction status at Cabana, Palm Beach.
Construction Timeline
- March 2022 – Structural back propping removed from basement levels and ground floor
- March 2022 – Architectural pre-cast fluted facade panels installed on ground floor and level 1
- April 2022 – Glazing Installation on Level 1
Preparing for Absolute Beachfront Luxury
Situated in Palm Beach, one of the top five most searched suburbs in Queensland, Cabana lies directly opposite the recently completed artificial reef, making it a surfer’s dream.
Cabana Palm Beach is due for completion by the end of 2022.